Windfarm
Design
80 x 5 MW = 400 MW
- Construction Phase One
- Construction Phase Two
| 15 | wind turbines |
5 MW | each |
| 75 MW | estimated total capacity |
Expected construction: From end 2020
Expected commissioning: From end 2021
| 65 | wind turbines |
5 MW | each |
| 325 MW | estimated total capacity |
Expected construction: From end 2021
Expected commissioning: From end 2023